Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599536

- Product Categories
- Friendly Links
- home > Supply > Small environmental equipment, environmental Luoyang Yu Quan (certified), Liaoning Environmental Protection Equipment
Small environmental equipment, environmental Luoyang Yu Quan (certified), Liaoning Environmental Protection Equipment
Information Name: | Small environmental equipment, environmental Luoyang Yu Quan (certified), Liaoning Environmental Protection Equipment |
Published: | 2014-12-22 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Small environmental equipment, environmental Luoyang Yu Quan (certified), Liaoning environmental protection equipment provided by the Luoyang Yu Quan sewage treatment Limited. Luoyang Yu Quan Sewage Treatment Co., Ltd. (www.yuquankj.net) is specialized in "environmental protection equipment, sewage treatment equipment, industrial wastewater treatment equipment, grille decontamination machine" of the enterprise, the company of "honesty, hard service" concept, to provide you with the highest quality products and services. Welcome to inquire! Contact: Chang Chih-feng. Reflux regulating weir within the integrated wastewater treatment equipment maintenance manual door operation: installation and commissioning of integrated wastewater treatment equipment reflux ball Grease the door section, check the two 0-ring for damage, then the door ball seat assembly axis device. Reflux door with the door shaft device erected, reflux door should be left part and the bottom 20 - 40mm gap. Measuring reflux door recessed flange distance to the top of the pool, from which to adjust the position of the bearing support means. The support means from the top down-hole, flange connection bump, the overall degree of vertical leveling, note that the center of rotation reflux door, horn contact surface should be greater than 80%, allowing only the superposition of two horns. Barring reflux door, check the working status of compliance. After hoist and bracket assembly, overall hoisting. Special Note: The opening range hoist 900, which should correspond to the opening of the reflux of the door. After connecting couplings bump in the lifting state, the real stand pad and spot welding. Barring hoist large-scale environmental equipment, check the working status of Circular Flow door should be fully open to debug several degrees, and then confirm the eligibility bracket weld and embedded parts. Reflux regulating weir within the integrated wastewater treatment equipment maintenance and maintenance of the door without special maintenance and repair, support device is recommended every six months to check the situation of bearing grease. Reflux adjustable weir gate shutdown procedures and requirements to stop the water before stopping use of the sleeve valve mud, water outflow valve sleeve to small environmental equipment, mud proof is completed, before stopping in the integrated wastewater treatment equipment. If you stop for more than two hours before the start of the bottom should detect whether the sludge sedimentation, if sludge is first closed sleeve valve, to the pool water, the water level reaches the normal position, and then turn the sleeve valve mud , when the outflow of water from the sleeve valve before starting. Above picture is for reference only, please consult our detailed models, more models, please visit our official website or call us for integrated wastewater treatment equipment in sedimentation tank design principles: integrated wastewater treatment equipment in the inclined plate sedimentation from theory only macro studied laminar flow state, in fact, inclined plate sedimentation tank water is pulsating. This is because when the swash plate in a big alum precipitate particles in relative motion with water, it will produce a small vortex smelting environmental protection equipment in the back of alum particles produce these vortices caused by the movement of the water ripple. These pulsations for settling large alum particles without any effect, for the precipitation reaction is not complete backwater of small particles play the role and, therefore, affect the water quality. Integrated wastewater treatment equipment sedimentation equipment, the introduction of vortex turbulence control segment, forming a floc particles suspended dynamic region in the ramp area and vortex turbulence control section, use the contact flocculation and sedimentation principle removal of solid particles, eddy turbulent spin control segment located at the lower side of the ramp into the water, the high concentration of alum, while containing alum of water flow through this area, resulting in a strong precipitation entrainment, so a small portion of the adsorption is not minimal flocculation colloid, which is part of the media can not be filtered colloid colloid, and its side into the water due to its strong straight segments, relying on its siding precipitation overcome adhesion layer entrainment during water changes discrete phenomenon. At the same time due to its resistance to water makes water distribution more uniform surface of each precipitation, so that the precipitation effect is more pronounced. Above picture is for reference only, please consult our detailed models, more models, please visit our official website or call us for. |
Admin>>>
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility