Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599536

- Product Categories
- Friendly Links
- home > Supply > Small environmental equipment, environmental Luoyang Yu Quan (certified), Nanning Environmental Protection Equipment
Small environmental equipment, environmental Luoyang Yu Quan (certified), Nanning Environmental Protection Equipment
Information Name: | Small environmental equipment, environmental Luoyang Yu Quan (certified), Nanning Environmental Protection Equipment |
Published: | 2014-12-23 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Small environmental equipment, environmental Luoyang Yu Quan (certified), Nanning environmental protection equipment provided by the Luoyang Yu Quan sewage treatment Limited. Luoyang Yu Quan Sewage Treatment Co., Ltd. (www.yuquankj.net) is specialized in "environmental protection equipment, sewage treatment equipment, industrial wastewater treatment equipment, grille decontamination machine" of the enterprise, the company of "honesty, hard service" concept, to provide you with the highest quality products and services. Welcome to inquire! Contact: Chang Chih-feng. Sewage compressor maintenance and maintenance: In order to make the sewage treatment compressor can normally reliable operation, life assurance unit shall develop a detailed maintenance plan, execute fixed-man operation, regular maintenance, periodic inspection and maintenance, so empty Pressure unit kept clean, no oil, no dirt. The main components of sewage treatment compressor maintenance maintenance refer to the following table: cleaning cycles --- A. Must be determined according to the table when the repair and replacement of the components: pressure compressor within the system have been released, has been separated from the other pressure source, switch on the main circuit has been disconnected, and has been allowed to do the closing of the security identity . B. Sewage compressor cooling compressor oil change time depends on the use of the environment, whether acid gas humidity, dust and air. Newly acquired compressor first 500 hours of operation shall be replaced with new oil, after the replacement of the normal oil change every 4000 hours, annual operating less than 4000 hours of machine should be replaced once a year. C. Oil filter switched on for the first time 300-500 hours smelting environmental protection equipment must be replaced, the second in 2000 hours to replace, press the normal time after every 2000 hours to replace. D. Repair and replacement of the air filter or intake valve, remember to prevent any debris falling into the compressor host cavity. Operation will host the entrance closed after the operation is completed, the direction of rotation by host to hand the number of rotations to ensure that no obstacles, to boot. E. In sewage treatment compressor running 2000 hours per tightness around the belt should be checked, if the belt is loose side, to be adjusted until the belt tension so far; in order to protect the belt, in the whole process due to the need to prevent oil pollution belt scrapped. F. Each time you change the oil, must also replace the oil filter. G. Sewage compressor replacement parts company with original parts as possible, otherwise the matching problem occurs, the supplier is not responsible. Above picture is for reference only, please consult our detailed models, more models, please visit our official website or call us for sewage treatment equipment PAM preparation device: sewage treatment equipment automatic dispensing system PAM large environmental protection equipment, the use of dual-chamber dissolved aging storage and dosing system, fully automatic operation of small environmental equipment, can also be converted to manual control. Preparation of the final concentration of 0.2% to 0.5%, the preparation and the ability to meet the requirements of the filter press. Device shall be powder storage tank, vacuum suction device, powder dosing device, liquid storage tanks deployed, blender, mix the liquid dilution system, control panel and valves, switches and other components. Sewage treatment apparatus should be applicable to PAM apparatus or a high concentration of high-molecular flocculant powder flocculant solution into deployment. Preparation of a medicament when using a twin-screw feeder for raw material powders accurate metering, the medicament is dissolved drug after stirring, to a concentration of 0.3 to 0.5% of the solution is stored. Pharmacy curing time is about 60min, not less than 45min. When the dosing system again after dilution agent concentration diluted 0.1-0,2%, quantitative mixed with sludge. Sewage treatment facilities in the flocculant mixing device made of stainless steel, and set a dedicated control cabinet, both manual button control and environmental protection equipment, but also with the sludge dewatering machine control cabinet line; the control system should be improved instrumentation is complete, accurate indication; pipe lines neat, regular, smooth, piping no leakage. Above picture is for reference only, please consult our detailed models, more models, please visit our official website or call us for. |
Admin>>>
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility