Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599536

- Product Categories
- Friendly Links
- home > Supply > Environmental Protection Equipment Co., Ltd. | Luoyang Yu Quan Environmental (certified) | Environmental Equipment
Environmental Protection Equipment Co., Ltd. | Luoyang Yu Quan Environmental (certified) | Environmental Equipment
Information Name: | Environmental Protection Equipment Co., Ltd. | Luoyang Yu Quan Environmental (certified) | Environmental Equipment |
Published: | 2014-12-24 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Environmental Protection Equipment Co., Ltd. | Luoyang Yu Quan Environmental (certified) | environmental protection equipment provided by the Luoyang Yu Quan sewage treatment Limited. Luoyang Yu Quan Sewage Treatment Co., Ltd. (www.yuquankj.net) is specialized in "environmental protection equipment, sewage treatment equipment, industrial wastewater treatment equipment, grille decontamination machine" of the enterprise, the company of "honesty, hard service" concept, to provide you with the highest quality products and services. Welcome to inquire! Contact: Chang Chih-feng. Submersible pumps sewage treatment equipment installation, testing and training: A. Sewage treatment equipment installed submersible pumps submersible pump sewage treatment equipment installation form with vertical submersible motor and pump directly connected by the pump casing and impeller composed by electric hoists, chain hoists along the guide rod movements, while declining with links Block automatic coupling; · submersible pump installation sequence device manufacturers installation manual shall prevail; ? Before installation of sewage treatment facilities, manufacturing and packaging to prevent damage to the protective part of paste, not tear off in advance; Sewage treatment equipment diving When the pump is installed, the installation location and elevation should meet the design requirements, the plane position deviation is less than ± 10mm, elevation deviation is less than ± 10mm; · submersible pumps should be adjusted to the level of the base, its level is not greater than 1/1000; Dual guide rod The installation must be parallel and perpendicular environmental equipment, its parallel deviation is less than ± 2mm, vertical deviation should be less than 1/1000; full-length deviation of not more than ± 3mm. Sewage treatment equipment submersible pumps water pipe flange surface should be flat. · All sewage treatment equipment installing Hua, Seller shall conduct field tests, the test content and test results should meet the technical requirements of the tender, and has been recognized by the buyer engineer. Engineers test records to the buyer. If the test results do not meet the requirements, the seller shall be responsible for replacing the Environmental Protection Equipment Co., site survey tools owned by the seller. Above picture is for reference environmental equipment exhibition network, detailed models, please consult us, more models, please visit our official website or call us for integrated wastewater treatment equipment submersible sewage pump alarm control: stator winding temperature alarm control: When When the submersible pump motor failure (overload, phase failure, phase) winding temperature surge, when the panel winding overtemperature indicator blinks to show that the motor overheating fault protection device automatically shut down. Thrust bearing overtemperature alarm control: When the submersible pump bearing failure temperature surge, when the over-temperature, this green plant output device failure, the panel bearing overheating indicator flash alarm, security sumac devices automatically shut down. Integrated wastewater treatment equipment Submersible Sewage Pump Bearing oil chamber humidity alarm control: When the submersible pump leaking oil chamber failure, endanger the normal pump operation, fault output of the protection device, panel lights flash flooding oil chamber alarm protection the device automatically shut down. Motor cavity leakage alarm control: When the submersible pump motor cavity leaking failure, endanger the normal operation of pump 'output of the protection device failure, flashing lights on the front panel of each leak alarms, automatic shutdown protection. Above picture is for reference only, please consult our detailed models, more models, please visit our official website or call us for. |
Admin>>>
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility