Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599536

- Product Categories
- Friendly Links
- home > Supply > Industrial wastewater treatment, look for Luoyang Yu Quan environmental protection, industrial waste water treatment pond
Industrial wastewater treatment, look for Luoyang Yu Quan environmental protection, industrial waste water treatment pond
Information Name: | Industrial wastewater treatment, look for Luoyang Yu Quan environmental protection, industrial waste water treatment pond |
Published: | 2015-05-21 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Integrated wastewater treatment equipment installation and commissioning - (1) Service requirements: The user is responsible integrated wastewater treatment equipment necessary maintenance, including power supply equipment required for the operation to meet, electronically controlled filling flocculant system, water supply and providing compressed air (2) connected devices: The user should complete the flocculant mixing system control panel and wiring is not installed on the system frame integrated wastewater treatment equipment. Safety precautions: integrated wastewater treatment equipment for all of the on-site installation site should refer to the relevant standards, and with reference to the drawings provided safe construction. Sewage treatment system control principle --- wastewater treatment filter operating conditions including normal filtration and backwash control of two. 1) filter normal filtering procedures: According to the wastewater treatment system set time, first open the raw water inlet valve, the valve filter out early, early time 3-5min filter system returns to normal after the filter, the filter system is turned on raw water inlet valve, the water valve. 2) backwash control procedures: When the sewage treatment system to filter the received level signal when an instruction to periodically flush plc industrial wastewater treatment signal either, according to the FIFO principle queued for. First turn off the raw water inlet valve, water valve while the valve open anti-burst, recoil sewage valve industrial wastewater treatment, after the signal to be the valve in place, start the fan into gas rushed to complete a separate air impact will take time 3-5min, Then open the valve anti stormed industrial wastewater treatment equipment, valve after the signal to be in place, open sewage water mixed gas recoil rinse water pump sulfuric acid industrial wastewater treatment, time is 8-10min. Then stop fan and close the valve recoil single water rinse, the time required for 3-5min, stop the pump and close after the completion of the anti-burst valve, recoil sewage valve, opening the purge valve exhaust, open a raw water intake valves, valve filter out early, early time 3-5min filter sewage treatment system into normal filter. Above picture is only for reference, detailed models, please contact us for more models, please visit our official website or call us for sewage treatment compressor valve maintenance recommendations: safety valve sewage treatment factory before it is set in the machine, Suppliers do not advocate unauthorized users to adjust the safety valve. If it proves necessary adjustments, should be in the local labor security department or vendor maintenance personnel guidance, in order to avoid adverse consequences. Sewage Treatment compressor valve maintenance advice to users in general sewage compressors, compressor maintenance offer some suggestions, users can reference implementation. ① week:. A Check the compressor unit without abnormal noise and leak check the meter reading is correct b c Check temperature display is displayed properly. ② Monthly: Check whether within a compressor unit has rust, loose place, if corrosion is rust or oil paint, loose at Tighten b discharge condensate. ③ every three months:. A clear outer surface dust b cooler and fan cover, fan motor at filling oil to the bearings c Check hoses for aging, cracking phenomenon d Check the electrical components and clean... electronic control box. Above picture is only for reference, detailed models, please contact us for more models, please visit our official website or call us for industrial wastewater treatment, look for Luoyang Yu Quan environmental protection, industrial waste water treatment pond by the Luoyang Yu Quan Sewage Treatment Co., Ltd. provided. Luoyang Yu Quan Sewage Treatment Co., Ltd. (www.yuquankj.net) is specialized in "environmental protection equipment, sewage treatment equipment, industrial water treatment equipment, grille decontamination machine" of the enterprise, the company adhering to the "honesty, hard service" concept, to provide you with the highest quality products and services. Welcome to inquire! Contact: Zhang Zhifeng. |
Admin>>>
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility