Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13599536

- Product Categories
- Friendly Links
- home > Supply > Please look for slaughter sewage processor _ _ Luoyang Yu Quan Environmental slaughter sewage treatment
Please look for slaughter sewage processor _ _ Luoyang Yu Quan Environmental slaughter sewage treatment
Information Name: | Please look for slaughter sewage processor _ _ Luoyang Yu Quan Environmental slaughter sewage treatment |
Published: | 2015-05-25 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Integrated wastewater treatment equipment structure of the pump: The pump is composed of three parts motor, gear box, cylinder and other components: gearbox components by a cam mechanism, worm gear ratio stroke adjustment mechanism and institutions; by rotating the hand wheel adjustment to implement adjust tappet stroke, change distance from the surface of the diaphragm stretch to achieve the purpose of changing the flow. Integrated wastewater treatment equipment pump cylinder block is made head, suction valve, discharge valve, the diaphragm base composition of each film. Integrated wastewater treatment equipment pump works: the worm drive motor via a coupling and worm gear reducer by the eccentric rotation of the spindle and rotary movement, led by the eccentric tappet guide bush reciprocated. Integrated wastewater treatment equipment, together with the pump diaphragm, by the action of the check valve of the pump cavity gradually form a vacuum, suction valve open, inhale liquid; when the diaphragm moves forward dead, this time the intake valve is closed, exhaust valve open, liquid discharge under the diaphragm push. By adjusting the pump stroke reciprocating along some also work under pressure to form a continuous, quantitative discharge liquid. Integrated wastewater treatment equipment pump flow control features: the pump flow control is adjusted by rotating the hand wheel to drive the adjustment screw is rotated, thereby changing the spacing between the tappet change in the pump chamber diaphragm movement stroke to determine the size traffic . Hand wheel adjustment scale sewage treatment decisions diaphragm stroke slaughter plant, was 95% accurate. Sewage treatment system for the dosing of lime bags slaughter incoming sewage treatment, delivered to the storage silo via a vacuum conveying system. Sewage treatment system in normal operation, each time adding the lime volume is fixed, by way of automatic dosing. When the main ingredient PLC began receiving instruction, PLC automatically open the bottom of the hopper feeder star, will feed into the weigh hopper, the weighing device when the online test weighing the desired value, PLC closed rotor outlet valve, and then open the bottom of the silo weighing gate valve, and open the screw conveyor slaughter sewage treatment program, the lime delivered to the conditioning tank. Lime will be in the 5 to 15 minutes from the weighing hopper transferred to the conditioning tanks. Electrical automation systems integrated wastewater treatment equipment: integrated wastewater treatment equipment automatic control system to control the operation of the entire filtration system, stop and alarm: slaughter sewage processor when the system is operating normally, to ensure continuous flushing. When abnormal operation, alarm issued a directive to stop the filtration system run by an operator control cabinet or central control system provides. And to cooperate in the control room to achieve the filtration system processes, instruments, equipment parameters to be monitored. 1) to require total system capacity and operating capacity. 2) integrated wastewater treatment equipment low-voltage electrical cabinet requires selection of advanced air circuit breaker, cabinet components requires selection of well-known brand quality and reliable products. 3) integrated wastewater treatment equipment and low voltage distribution cabinet and local control box must be able to achieve manual / automatic control, automatic control of the control cabinet program control by the PLC. 4) outdoor control box must reach IP65 degree of protection. Installation and testing integrated wastewater treatment equipment: continuous flow sand filter systems should be the complete system, the entire system (including pipes and pipe fittings) bid by the contractor responsible for the installation. Provided by the supplier of continuous flow sand filter system must be responsible for the system processing effect. That water to meet water quality standards. Please look for slaughter sewage processor _ _ Luoyang Yu Quan Environmental slaughter wastewater treatment provided by the Luoyang Yu Quan sewage treatment Limited. Luoyang Yu Quan Sewage Treatment Co., Ltd. (www.yuquankj.net) in the field of sewage treatment equipment devoted boundless enthusiasm and passion, Luoyang Yu Quan Environmental been customer-centric, for customers to create the concept of value, quality, service to win market, and sincerely hope to cooperate with the community to create success, to create brilliant. Related businesses welcome inquiries, contact: Zhang Zhifeng. |
Admin>>>
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 30440 visitor
Copyright © GuangDong ICP No. 10089450, Luoyang Yu Quan Sewage Treatment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility